Projected Costs of Generating Electricity from Power Stations for Commissioning in the Period 1995-2000
I will be using this book for:

Projected Costs of Generating Electricity from Power Stations for Commissioning in the Period 1995-2000

by Organisation For Economic Co-Operation And Development, Nea

Technical Report Policy energy economics
1 Star 2 Star 3 Star 4 Star 5 Star
0.0 out of 5 stars (0 ratings)

An OECD report detailing projected electricity generation costs for power stations scheduled for commissioning between 1995 and 2000, covering capital, fuel, and operating expenses across technologies.

About This Book

This publication presents detailed cost projections for electricity generation from various power station types planned for commissioning during 1995-2000.

Prepared by the OECD Nuclear Energy Agency and the International Energy Agency, it examines capital, operating, and fuel costs across different technologies and regions.

The report provides standardized methodologies for comparing generation costs and supports policy decisions regarding future energy investments.

Data covers conventional thermal, nuclear, and renewable power stations with sensitivity analyses for key economic parameters.

Reviews

No reviews yet. Be the first to review this book!


Write a Review
I will be using this book for: